Testing and proper start-up are required before the continuous carbonization machine is put into production
Before the formal production of a continuous carbonization furnace equipment, we will conduct a short test of the machine. After a period of operation observation, to ensure that the normal operation of the machine is normal, the power supply will be turned off and then to the machine. The material in the storage bin is filled,…